Contact Dave Hogg

Tel: +44 (0)7900 013007
Email: Dave@EPMinfra.com

Since August I've been pretty much full time helping Simon and his team out at M&G both with Infrastructure and Integration.

The 11.1.2.2.500+ set of patches has been applied, and the great work that was done by Edgewater Ranzal to create HPCM based fully allocated Plan data has been enhanced to run more of the HPCM elements in parallel (e.g. ASO Genealogy). These speed improvements have allowed a fully allocated 48 period rolling forecast to become viable via overnight processes.

Some of the data movement back and forth between the BSO and ASO cubes has also been cut out by use of ASO Reports, in place of the JExports. All good stuff, and a great team to work with.

Go to top